Disciplines / Research questions

建筑学

10 个研究主题 · 24 个问题

被动式建筑在不同气候区的性能可迁移性3 个问题
  1. Experimental and practical viability of the Passivhaus standard in hot-humid tropical housing: validating the uninsulated ground floor as a cooling-season heat sink and the ground-coupled and economic feasibility questions it raises

  2. Reliable mitigation of summertime overheating and adaptive-comfort compliance for passive houses in subtropical climates

  3. Unresolved building-services barriers to Passive House deployment in extreme climates: frost-safe combined heat-and-humidity recovery for very cold climates, low-temperature supply-air dehumidification for hot-humid climates, and moisture-safe basements

玻璃幕墙节能优化中的采光—冷负荷悖论1 个问题
  1. Adaptive shading operation and glare-inclusive validation of side-lit window optima for university classrooms in Shanghai's hot-summer/cold-winter climate

参数化设计搜索中的多目标解不稳定2 个问题
  1. Generalizing the Uncertainty-related Pareto Front (UPF) framework to general uncertain multi-objective optimization

  2. Generalization and reliability of field-grouped two-stage sequential multi-objective optimization for building performance design

高层住宅核心筒效率与疏散冗余的权衡1 个问题
  1. Validated escape-route design and evacuation modelling for Malaysian public multi-storey housing: generalising staircase availability, position, and blockage effects beyond a single PPR layout

建筑能耗反弹效应对节能改造收益的侵蚀2 个问题
  1. Validating rebound-effect estimation for thermally retrofitted non-residential public service buildings: theory, measurement, benchmarks, and long-run dynamics

  2. Causal attribution, end-use decomposition, direct and indirect rebound, and multi-season persistence of household energy savings after residential retrofit

建筑形态紧凑度与全生命周期碳排放的非单调关系4 个问题
  1. Is whole-life-cycle carbon a non-monotonic function of building-form compactness? Characterizing the embodied–operational balance across building and urban-block scales

  2. Causal attribution and external validity of the non-monotonic urban density–spatial carbon performance relation in Chinese megacities

  3. Temporal stability, cross-city generalizability, and energy-accounting completeness of block-scale density effects on urban carbon emission intensity

  4. Generalizing the relation between building-shape compactness and embodied energy and carbon: parameterized inventories, geometry-driven structural dimensioning, and combined embodied–operational assessment beyond one construction system and country

空间句法指标能否稳定预测真实人流2 个问题
  1. Transferable pedestrian-flow prediction in traditional commercial streets: validating combined space-syntax and business-attraction models, and the conditions under which configuration or attraction dominates

  2. Enriching and validating urban-scale agent-based space-syntax pedestrian-volume models across diverse urban morphologies

历史建筑适应性再利用中的真实性—能效冲突4 个问题
  1. Transferability and extension of an integrated multi-criteria methodology for energy-efficient retrofit of heritage-building envelopes beyond a single case study

  2. Heritage-compatible reduction of post-adaptive-reuse operational energy, carbon, and summer discomfort in historic buildings: validated intervention strategies and generalisable retrofit guidance integrating occupant comfort perception

  3. Joint optimization of heating and cooling energy use and thermal comfort in adaptively reused historic buildings under rigid heritage-conservation constraints

  4. Monitored energy-efficiency retrofits and predictive modelling of the user-assigned-value–energy-behaviour–physical-condition interplay in heritage buildings

自然通风模型预测与实际建筑能耗之间的性能差距1 个问题
  1. Attributing over-prediction of buoyancy-driven natural ventilation in whole-building simulation: model form versus input uncertainty in multi-story, atrium-connected buildings

BIM模型与竣工实物信息不一致的系统来源4 个问题
  1. Quantitative evaluation of Scan-to-BIM modelling workflows: modeller training for secondary objects and hybrid manual-semi-automated modelling

  2. Post-mandate reassessment of final-drawing versus as-built mismatches in Dubai buildings: has mandatory BIM eliminated the mismatch problem measured in 2014?

  3. Allowable-error budgets for on-site scan-versus-CAD dimensional inspection of industrial plant piping systems

  4. Generalizable, project-independent causes of tolerance-related defects in construction

返回开放问题